OUR BIOGAS PLANTS

Złocieniec

Złocieniec

The Złocieniec biogas plant, built in 2015, operates on the basis of biogas produced as a result of anaerobic fermentation of raw materials of agricultural origin. The produced biogas is used for the production of electricity and heat. The biogas power plant is located in the industrial area of the city of Złocieniec, in the Zachodniopomorskie Province. The parameters of the generated heat give wide possibilities of its use.
Electric power – 0.999 MWe
Thermal power – 1.058 MWt
Electrical energy production – 8,095 MWh
Heat production – 8,103 MWhth (29,171 GJ)

Darskowo

Darskowo

Darskowo biogas plant built in 2015, operates on the basis of biogas produced as a result of anaerobic fermentation of raw materials of agricultural origin. The produced biogas is used for the production of electricity and heat. The biogas power plant is located in Darskowo, in the Drawsko Province, in the West Pomeranian Voivodeship. The technology used in the agricultural biogas plant guarantees the highest efficiency and effectiveness in the field of biogas and electricity production. In the immediate vicinity of the biogas plant there are many green areas, cultivated fields, of which forage can be used in the biogas plant process. Manure and slurry from nearby farms, including animal husbandry, can also be used to produce biogas.
Electric power – 0.999 MWe
Thermal power – 1.058 MWt
Electric power production – 8,095 MWh
Heat power production – 8,103 MWhth (29.1171 GJ)

Tończa

Tończa

The construction of the Tończa biogas plant was completed in 2015. The investment site is located in Tończa, in the eastern part of the Masovian Voivodeship, Węgrów poviat, in the Liw municipality. The biogas plant will produce biogas as a result of anaerobic digestion of organic substrates of agricultural origin (silage of energetic plants, maize, grass and livestock manure). The produced biogas will be used to produce electricity and heat.
Electric power – 0.999 MWe
Thermal power – 1.110 MWt
Electric power production – 8,348 MWh
Thermal power production – 8,357 MWhth (30,085 GJ)

Krzywa

Krzywa

Construction of the Krzywa biogas pant was completed in 2015. The investment is located in the village of Krzywa, Podlaskie voivodship, 15 km from Bielsk Podlaski, on the way to Hajnówka. As a result of anaerobic digestion of organic feedstock of agricultural origin, the produced biogas will be used for the production of electricity and heat.
Electric power – 0.999 MWe
Thermal power – 1.110 MWt
Electric power production – 8,348 MWh
Thermal power production – 8,357 MWhth (30,085 GJ)

Dzierżki

Dzierżki

The construction of the biogas plant Dzierżki was completed in 2015. The installation is located near the village of Dzierżki, Poświętne commune, in the Podlasie voivodship. In the biogas plant, biogas will be produced as a result of anaerobic digestion of organic substrates of agricultural origin. The produced biogas will be used to produce electricity and heat.
Electric power – 0.999 MWe
Thermal power – 1.110 MWt
Electric power production – 8,348 MWh
Thermal power production – 8,357 MWhth (30,085 GJ)

Gorajec

Gorajec

The construction of the Gorajec biogas plant was completed in 2015. The investment is located in Gorajec, Cieszanów commune, in the Lubaczów agricultural district, near the border of the Podkarpackie and Lubelskie voivodships. In the biogas plant, biogas will be produced as a result of anaerobic digestion of organic substrates of agricultural origin. The produced biogas will be used to produce electricity and heat. New technologies and emerging solutions ensure high efficiency of biogas installations, providing excellent conditions for creating a local energy system. Distributed energy sources guarantee local energy security for the region. In the vicinity of the power plant there are agricultural lands, mainly intended for maize cultivation. This is a potential for obtaining feedstock for biogas production and for digestion of digestate.
Electric power – 0.999 MWe
Thermal power – 1.110 MWt
Electric power production – 8,348 MWh
Thermal power production – 8,357 MWhth (30,085 GJ)

Stary Kornin

Stary Kornin

Construction of the Stary Kornin biogas plant was completed in 2015. The investment is located in the village of Stary Kornin, located in the Dubicze Cerkiewne commune. As a result of anaerobic digestion of organic substrates of agricultural origin, the produced biogas will be used for the production of electricity and heat. New technologies and emerging solutions ensure high efficiency of biogas installations, providing excellent conditions for creating a local energy system. Distributed energy sources guarantee energy security for the region.
Electric power – 0.999 MWe
Thermal power – 1.110 MWt
Electric power production – 8,348 MWh
Thermal power production – 8,357 MWhth (30,085 GJ)